- Prime industrial site strategically identified and acquired.
- Development delivered two high-specification units totalling 54,421 sq ft and 30,032 sq ft, each with 10m eaves height.
- Completed a carbon-neutral, BREEAM ‘Excellent’ scheme incorporating air source heat pumps, photovoltaic panels, and battery storage technology.
Poyle Point, Heathrow
Site Transformation to a Carbon-Neutral Warehouse Scheme in Key West London Logistics Location